G2LR Multi-Section Carbon Fiber Push-Pole (18ft to 24ft)
G2LR Multi-Section Carbon Fiber Push-Pole (18ft to 24ft)
G2LR Multi-Section Carbon Fiber Push-Pole (18ft to 24ft)
G2LR Multi-Section Carbon Fiber Push-Pole (18ft to 24ft)
G2LR Multi-Section Carbon Fiber Push-Pole (18ft to 24ft)
G2LR Multi-Section Carbon Fiber Push-Pole (18ft to 24ft)
G2LR Multi-Section Carbon Fiber Push-Pole (18ft to 24ft)
G2LR Multi-Section Carbon Fiber Push-Pole (18ft to 24ft)

G2LR Multi-Section Carbon Fiber Push-Pole (18ft to 24ft)

Regular price $619.95

The G2LR is our middle of the road pole, offering excellent performance at a reasonable price. The G2LR multi-section carbon fiber push-pole is built from 96in sections of carbon fiber and epoxy tubing, and bonded using our heavy duty double-wall thickness ferrules. If built for delivery by Carbon Marine the sections are permanently bonded together and each bond is warranted against separation and water-leaks.  If built to be shipped (areas outside of Florida), each push-pole is pre-built up to the last stage and boxed with a kit containing all necessary supplies to complete the final bonds. At 21ft the G2LR weighs 4lbs, 5oz. To determine the length of pole you need, our rule of thumb is 3 feet over the length of the boat you will be poling.

We recommend this pole for the enthusiast angler; the person that poles more than a couple hours at a time, and more often than not.

DUE TO CIRCUMSTANCES BEYOND OUR CONTROL, G2LR'S ARE CURRENTLY NOT IN STOCK. WE ARE ACCEPTING BACKORDERS. FOR MORE INFORMATION PLEASE CALL THE OFFICE AT (813) 284-7040. THANK YOU.

Free delivery to customers in the State of Florida. 

CUSTOMERS OUTSIDE OF FLORIDA: Please call the Carbon Marine office (813) 284-7040 to learn your shipping and delivery options.  We have delivery and shipping options outside of Florida, but these options have time and location constraints.  We formulate a delivery/shipping solution based on your location and timing.  You will incur additional costs for delivery/shipping outside of Florida. We calculate these additional costs on a case-by-case basis.